Here is why ISRO has to postpone Chandrayaan-2 mission once again

Here is why ISRO has to postpone Chandrayaan-2 mission once again

chandrayan

This handout image offered by the Indian Space Research Organisation (ISRO) reveals the floor of the moon taken by Moon Impact Probe (MIP), after separating from India’s Chandrayaan-1 spacecraft, November 14, 2008.Reuters

As we reported earlier that ISRO has further delayed India’s second moon mission Chandrayaan-2. Originally it was scheduled to be launched in April this yr and that date was pushed again to October. Now, it seems that the company is taking a look at a 2019 launch. The Chandrayaan-2 mission is now slated to happen between January and March subsequent yr.

The chairman of ISRO, Okay Sivan, has said that they’re trying to launch Chandrayaan-2 on January three, 2019. However, it would get delayed till March, in the event that they miss this goal.

While talking concerning the newest delay, Sivan mentioned that it occurred as a result of they’d to make some modifications within the design in order that the spacecraft can land easily on the floor of the moon.  

The area company has additionally elevated the burden of Chandrayaan-2 by 600kg and that is as a result of through the checks they noticed that following the ejection of the moon lander, the satellite tv for pc would shake. So, the Indian area company determined to modify its design rising the mass of it, so the touchdown goes off effectively.

According to Sivan, additionally they concluded that the orbiter wants extra phases, which in flip wants extra gas.

ISRO

ISRO’s strongest launcher ever, GSLV Mk-III being rolled out from the Vehicle Assembly constructing to the launch pad for its experimental flight.IANS File

While speaking about ISRO‘s different future missions, Sivan added that ISRO has a plan of launching 50 satellites all through the following three years. They are planning to launch 22 satellites subsequent yr, which, if profitable, can be the utmost variety of satellites launched in any yr by ISRO.

It appears that the remainder of this yr is additionally going to be fairly busy for ISRO, because the area company is planning to launch a minimum of two missions every month, Sivan added.

The speedy subsequent mission PSLV C42, which is able to launch two industrial UK satellites, particularly NOVASAT and S1-Four, is scheduled to happen in September this yr.

After that In October, ISRO is slated to launch GSAT29 for the Digital India programme and hyper spectrum imaging satellites in addition to 30 industrial satellites.

Following that, GSAT-7A is scheduled to be launched in November and in December, GSLV-F11 can be launching AMISAT and GSAT-31, knowledgeable the chairman of ISRO.



Source link